Austrian Embassy Jakarta

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 Soft Opening

20.6.2011 staircase

20.6.2011 window view

20.6.2011 garden view

20.6.2011 front view

05.06.2011 garden view

05.06.2011 rooftop

05.06.2011 Last works before completion

17.05.2011 Green Building Council Indonesia is certifying the New AEJ

Building

05.05.2011 blower door test

05.05.2011 blower door test

05.05.2011 blower door test

27.04.2011 entrance

27.04.2011 garden terrace

27.04.2011 garden view

27.04.2011 terrace

27.04.2011 staircase

27.04.2011 foyer

27.04.2011 outlook

27.04.2011

27.04.2011

24.03.2011 garden view

24.03.2011 shading screen

08.03.2011 construction site, pool at main entrance

12.01.2011 outlook from office

12.11.2010 CCTC manifold

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 Rooftop Ceremony with Austrian President Fischer

10.11.2010 lobby

09.11.2010 conference room

24.10.2010 acoustic plasterboard installation

22.10.2010 construction site foyer

17.10.2010 thermal insulation of exterior wall

12.10.2010 concrete works

14.09.2010 groundfloor

14.09.2010 concrete works

31.08.2010 Streetview

23.08.2010_continuing formwork and rebar installation

15.08.2010_1.floor - concrete works

15.08.2010_formwork walls first floor

11.08.2010_working on pipes for CCTC

06.08.2010_pipe layout for CCTC (Concrete Core Temperature Control) a basic item for the sustainable cooling system

03.08.2010_structural works ground floor

03.08.2010_meeting with the structural engineer

27.07.2010_formwork column, ground floor

12.07.2010_concrete reinforcement

12.07.2010_column reinforcement

05.07.2010_thermal insulation

24.06.2010_building foundation

20.06.2010_formwork building foundation

20.06.2010

07.06.2010_excavation for building foundation

10.05.2010_ material delivery


Ambassador Klaus Wölfer, Ir. Imam Santoso Ernawi, Director General of Spatial Planning, Ministry of Public Works

Ambassador Klaus Wölfer, Mr. T.A. Samodra Sriwidjaja, former Indonesian Ambassador to Austria

Mr. Budi Sukada, Honorary President of Indonesian Architectural Association, Mrs. Retno Marsudi, Managing Director for America and Europe in Indonesia, Austrian Ambassador in Indonesia, Klaus Wölfer

Austrian Ambassador in Indonesia, Klaus Wölfer

Zum Seitenanfang